Pre-Possession Inspection Checklist

Inspect your flat before you register it. 10 categories, 70+ checkpoints — legal documents, carpet area, structure, finishes, and deviations from the sale agreement.

0

Pass

0

Fail

0

N/A

61

Pending

0%

Inspected

Inspection Details

📜

Legal & Documents

Occupancy Certificate (OC)

Original OC issued by municipal authority

Building name, flat number match

Not partial / conditional OC

Date of OC noted — don't register without this

Completion Certificate (CC)

Original CC received

Matches approved plan

Any deviation flagged in CC?

Khata / Mutation

Khata certificate / mutation entry in your name or builder's name

Khata extract provided

Property tax paid up to date — check receipt

Encumbrance Certificate

Latest EC for the land + flat

No pending mortgage beyond what you're settling

30-year EC for resale; 13-year minimum for new

Approved building plan

Sanctioned plan copy received

Matches what's built on ground

Revised/modified plans on record if any deviation

Sale deed / registration papers

Draft sale deed reviewed by lawyer

Carpet area declared on papers matches actual (RERA)

Common area share defined

Stamp duty and registration fee calculated

RERA registration

Project RERA number displayed on site

RERA carpet area matches sale agreement

Quarterly progress reports on RERA portal

Society formation

Apartment association formed or formation date given

Bye-laws draft shared

Corpus fund amount disclosed

Maintenance charges structure provided

📏

Carpet Area Verification

Carpet area (RERA definition)

Measured wall-to-wall excluding external walls

Excludes balcony, terrace, shaft

Within ±3% of sale agreement

Discrepancy greater than 3% is refundable under RERA

Balcony area

Separately measured

Matches plan

Open to sky (not enclosed)

Railing height ≥ 1000mm (NBC)

Utility area

Separately measured and disclosed

Usable for washing machine + drying

Super built-up vs carpet

Loading factor disclosed (usually 1.3–1.5)

You are paying per carpet area (RERA requirement post-2017)

Ceiling height

Minimum 2.75m clear (NBC)

Consistent across rooms

No unexpected drops from false beams

🏗️

Structural & Walls

No visible structural cracks

No diagonal cracks at beam-column junctions

No cracks wider than 1mm

No cracks through RCC members

Wall plaster

No hollow sounds (tap test)

No visible cracks

Even finish — no undulations

Plumb — no lean

Beams and columns

No exposed reinforcement

No honeycomb in concrete

Beams level — no sagging

Columns plumb

Slab condition

No water seepage marks on ceiling

No efflorescence (white powdery deposits)

Slab thickness matches specification

Dampness check

Run moisture meter on all external walls

No damp patches visible

Corners and skirting areas dry

💧

Waterproofing & Leakage

Bathroom waterproofing

Ask for flood-test certificate (48-hour ponding)

No damp marks on ceiling below bathroom

Threshold hump present

Slope toward drain correct

Terrace waterproofing

If top floor — check ceiling for stains

Terrace accessible for inspection

Visible waterproofing layer (not just plaster)

Proper slope toward drain holes

Kitchen dry area

No dampness around sink area

No staining on adjacent walls

Utility / washing area

Properly waterproofed

Drain functional

No wall damage from past leaks

External wall leakage

No seepage marks from outside

Monsoon trial if possible

Window frame junction sealed

Parapet and coping

Coping covers parapet top

No gaps at joints

Drip moulding present on balcony edge

🚿

Plumbing

Water supply pressure

Adequate pressure on top floor

Both overhead and underground tank supply working

No air locks in lines

All taps functional

Every tap in every bathroom + kitchen + utility runs

Hot water from geyser (where fitted)

No drips when closed

Drain test

Pour 10 litres in each floor trap — drains within 2 min

Kitchen sink drains quickly

WC flushes fully

No gurgling / sewer smell

WC and fixtures

Firmly bolted

Concealed cisterns don't leak

Silicone seal at floor junction

Seat covers intact

Water tank capacity

Allocated share per flat documented

Overhead + underground capacity disclosed

Booster pump operational (if provided)

Hot water lines

Separate hot water lines where geysers are fitted

Insulation on hot water pipes

No cross-connection with cold water

Pipe material disclosure

CPVC / PPR for water supply — confirmed

SWR for drainage — confirmed

Brand/make matches agreement

Electrical

Sanctioned load

Matches what was promised

Certificate from electrical authority

Sufficient for your planned AC / geyser load

All switches work

Test every switch against mapped light/fan point

No loose fittings

No reverse polarity (use tester)

MCB / RCCB panel

RCCB present for each sub-circuit

Trips when test button pressed

Clear labelling of circuits

Brand matches specification

Earthing

Earthing resistance < 1 ohm (ask for test certificate)

All metal fixtures earthed

Geyser earthed

AC and geyser points

15A points at bedroom AC locations

15A point at bathroom for geyser

Adequate point count per room

Power back-up

DG backup points clearly marked on switchboard

Backup load allocated per flat disclosed

Inverter-ready wiring if promised

TV / cable / internet points

In every bedroom and living room

Working — confirm with cable vendor

Structured cabling disclosed

🎨

Finishes & Fixtures (vs Agreement)

Flooring

Material matches agreement (vitrified/marble/wood)

Brand matches where specified

No chipped / cracked tiles

No hollow tiles (tap test)

Consistent pattern and shade

Doors

Main door — solid wood as promised

Internal doors — material matches

Door hardware brand matches

No warping, peeling, scratches

Windows

Material matches (UPVC / aluminium / wood)

Brand confirmed (Fenesta / LG / Lingel, etc.)

Mosquito mesh where promised

Open-close-lock all functional

Kitchen platform

Granite / quartz / other as per agreement

Sink material as promised

Overhang sufficient (20-40mm)

Bathroom fittings

CP fittings brand matches (Jaquar/Grohe/Kohler)

Sanitary ware brand matches (Hindware/Cera/Kohler)

Anti-skid tiles in wet areas

Tiles up to ceiling height as promised

Paint

Brand and type match (Asian/Berger/Nerolac)

Interior emulsion as promised

External weatherproof paint on external walls

Even finish, no patches

False ceiling

Only where promised

Material matches (gypsum / POP)

Even finish, no sagging

🏢

Common Areas & Amenities

Lifts

All promised lifts installed and operational

Capacity matches agreement

Stretcher lift for buildings > 4 floors (NBC)

Licence + inspection certificate

Fire safety

Fire NOC issued

Hydrants, sprinklers, alarms per plan

Emergency staircase accessible

Fire extinguishers installed

Clubhouse / gym / pool

All promised amenities complete

Operational (not 'coming soon')

Fixtures match brochure

Landscaping

Completed as per plan

No pending civil work

Borewell / STP / WTP

Sewage treatment plant operational

Water treatment plant operational

Borewell yield disclosed

Solar / rainwater harvesting

Installed where mandated by city bylaw

Certificate provided

Capacity matches specification

Security

CCTV coverage at entry, lift lobbies, parking

Intercom to each flat functional

Gate and boundary wall complete

🚗

Parking & Storage

Parking allocation

Parking number mentioned on sale deed (not just allotment letter)

Covered vs open parking clear

Size adequate for your car

Column positions don't block door swing

EV charging

EV-ready point provided if promised

Load allocated for EV charging

MCB from your flat's meter (not common)

Storage / scooter parking

Scooter parking as per brochure

Storage room / mezzanine as promised

Visitor parking

Number of slots disclosed

Not double-allocated to flat owners

⚠️

Deviations & Snag List

Plan vs as-built

Walk through with sanctioned plan in hand

Any extra wall / reduced room size documented

Any common-area encroachment flagged

Brochure vs reality

All promised amenities present

Features not quietly removed (e.g., marble → vitrified)

Size of rooms not shrunk

Snag list signed

All snags documented in writing

Timeline for rectification set (usually 30-60 days)

Retention from builder payment until cleared

Handover letter

Take physical handover only after satisfying inspection

Inventory of keys, remotes, documents signed

Utility meter readings recorded (water, electricity, gas)

Defect liability period

DLP clause in agreement (5 years under RERA)

Structural defect coverage confirmed

Contact for rectification given

Download Pre-Possession Report PDF

Share with your lawyer, builder, or family before you register. Demand written response on every Fail before paying final instalment.