Interior Snag Checklist
Professional handover inspection checklist — 10 categories, 60+ checkpoints. Mark Pass/Fail, add remarks, download a branded PDF report.
0
Pass
0
Fail
0
N/A
54
Pending
0%
Inspected
Project Details
General
Overall finish quality
Consistent finish across all rooms
No visible defects at eye level
Matches approved design/sample
Cleaning
All surfaces dust-free
No cement/paint stains on fixtures
Glass and mirrors streak-free
Floor cleaned and polished
Alignment
All vertical lines plumb
Horizontal lines level
Symmetry maintained where designed
Edges
No sharp edges exposed
All laminates sealed at edges
Corner guards where specified
Silicone finish
Clean bead — no gaps or bubbles
Consistent width throughout
Colour matches surroundings
Applied at all wall-counter/wall-cabinet junctions
Carpentry & Modular
Wardrobe shutters
Open and close smoothly
Aligned with even gaps (2-3mm)
No warping or bowing
Handle/knob firmly fixed
Hinges
Soft-close working on all doors
No sagging — door stays where opened
Brand matches BOQ (Hettich/Hafele/Blum)
No squeaking
Drawer channels
Full extension without jamming
Soft-close engages properly
Drawer box straight — no tilting
Can hold 20kg+ without sagging
Edge banding
No peeling or lifting
Flush with surface — no lip
Colour matches laminate
Applied on all exposed edges (top, bottom, sides)
Internal finish
Laminate or matching finish inside all units
No raw/exposed plywood/MDF visible
Shelves properly supported
Clean — no sawdust or debris inside
Back panels
HDF/plywood back — not cardboard
Properly fixed — no gaps at edges
No bowing inward
Loft units
Accessible — can open from ground
Hydraulic/gas lift mechanism works
Supports weight (store test with 10kg)
Properly anchored to wall
Kitchen
Cabinets
Base units level and plumb
Wall units firmly anchored
No wobble or movement
Carcass material matches BOQ (BWP/HDHMR)
Shutters
All shutters open freely
Consistent gaps between doors
Finish matches approved sample
No chips or scratches
Hardware
All soft-close working
Pull-outs extend fully
Corner solutions (carousel/magic corner) rotate smoothly
Brand matches BOQ
Sink installation
No leak at drain connection
Silicone seal around sink edge
Mixer tap operates smoothly (hot + cold)
Waste coupling connected to drain
Chimney ducting
Duct connected to exterior (not recirculating)
No vibration or excessive noise
Auto-clean function works (if applicable)
Lighting works
Countertop
No chips or cracks
Joints sealed (if any)
Overhang consistent (20-40mm)
Support brackets at overhangs >300mm
Level — water doesn't pool
Backsplash
Fully grouted — no gaps
No hollow tiles (tap test)
Sealed at countertop junction
Clean — no adhesive marks
Electrical
Switchboards
All switches operate correct points
Plate flush with wall — no gap
No loose switches
Labeling matches if labelled
Light fixtures
All lights turn on/off properly
No flickering
Colour temperature as specified (3000K/4000K)
Positioned as per plan (centred/aligned)
LED strips
Even glow — no dark spots
Proper diffusion (no individual LED dots visible)
Dimmer works (if specified)
No visible wiring or transformer
Fan points
Hook/mount in RCC slab (NOT in false ceiling)
Fan balanced — no wobble
Speed regulator works all levels
25mm gap between fan rod and false ceiling
Power sockets
All 5-amp and 15-amp sockets working (test with device)
USB sockets working (if specified)
Socket positions match furniture layout
No reverse polarity (use tester)
Earthing
RCCB trips when test button pressed
Earthing resistance <1 ohm (get certificate)
All metal fixtures connected to earth
MCB labeling matches circuits
Ceiling & Paint
Ceiling finish
Smooth — no undulations visible at grazing light
No cracks at joints (tape + compound properly done)
Level — no sagging
Access panels provided where needed (AC, junction box)
Cove lighting
Even glow — no hot spots or shadows
Cove gap consistent (100-150mm from wall)
LED strip properly concealed
No visible wiring or connectors
Paint finish
Uniform colour — no shade variation between walls
No brush marks, roller marks, or drips
Consistent sheen (matte/satin as specified)
Clean edges at corners, switches, and frames
Corners
Sharp, clean corners — no wavy lines
Internal corners smooth (no bulging plaster)
External corners protected (corner beads where specified)
Wall edges at junctions
Clean line where wall meets ceiling
Clean line where two paint colours meet
No paint on ceiling from wall painting
Shadow gap clean (if designed)
Doors & Windows
Doors
Open and close smoothly — no scraping on floor
Self-closing hinge works (if specified)
Gap at bottom consistent (8-10mm)
No warping — lies flat when closed
Finished on both sides — no raw edges
Door locks
Lock and latch operate smoothly
Key works from both sides
Deadbolt engages fully
Handle firm — no wobble
Window shutters
Open, close, and lock properly
Rubber gasket/seal intact (no air gap)
Mosquito mesh slides freely (if provided)
No water entry during rain (check seal)
Glass panels
No scratches or cracks
Tempered glass where required (bathroom, balcony)
Silicone seal complete around edges
Clean — no adhesive residue
Sliding systems
Glide smoothly without force
Track clean — no debris
Stopper prevents door from jumping off track
Lock mechanism works
Plumbing
Faucets
Hot and cold both work
No drip when closed fully
Flow rate adequate
Brand matches BOQ (Jaquar/Grohe/Kohler)
Wash basin
Level — water drains completely
No leak at waste coupling
Overflow works
Silicone seal at wall junction
Shower
Rain shower + hand shower both work
Diverter switches properly
Adequate pressure
No leak at wall connection
WC installation
Flush works — full and half flush
Concealed cistern — no leak
Seat cover hinges firm
Silicone seal at floor junction
No wobble — firmly bolted
Drainage
All floor traps drain quickly (pour water test)
No pooling — correct slope toward drain
Trap has water seal (no sewer smell)
Drain cover sits flush with floor
Waterproofing
No damp patches on ceiling below bathrooms
Silicone around all pipe penetrations
Threshold hump prevents water from exiting bathroom
Flood test done before tiling (48 hours — ask for certificate)
Flooring
Tiles
No hollow tiles (tap with coin — listen for hollow sound)
No chipped corners or edges
Pattern/direction consistent across room
Colour consistent — no shade variation between lots
Tile joints / grout
Grout lines consistent width throughout
Grout fully filled — no gaps
Colour consistent
Waterproof grout used in wet areas
Leveling
Floor level — no lippage between tiles
Slope toward drain in wet areas (pour water test)
No undulations visible at grazing light
Threshold level transition between rooms
Skirting
Flush with wall — no gap
Height consistent throughout
Joints mitered at corners
Silicone at top edge if specified
Furniture
Sofa / loose furniture
Fabric/leather matches approved sample
Frame solid — no creaking
Cushions firm and even
Legs stable — no wobble
Beds
Headboard firmly mounted
Storage mechanism works (hydraulic/drawer)
No sharp edges
Mattress fits properly — no gap at edges
Tables
Level surface — glass of water doesn't slide
Finish matches sample
Legs stable on floor
Edge treatment smooth
Mirrors
Firmly mounted to wall
Level — reflection is straight
No dark spots or distortion
Edges finished (bevelled/polished)
Final Handover
BOQ verification
All items in BOQ delivered and installed
Material brands match BOQ specification
Quantities match — no shortfall
Any variation orders documented and signed
Warranty documents
Kitchen modular warranty card received
Hardware warranty (Hettich/Hafele) card received
Countertop warranty (if quartz/Corian)
Appliance warranties collected and registered
Appliance manuals
All appliance user manuals collected
Installation certificates for chimney, hob, oven
Service contact numbers documented
Keys / access
All door keys received (minimum 2 sets)
Window keys received
Smart lock access codes set up (if applicable)
Gate remote / intercom access configured
Snag rectification
All snag items from this checklist addressed
Rectification verified and signed off
Timeline for pending items documented in writing
Retention amount held until all snags resolved
Download Snag Report PDF
Branded PDF with project details, all items, Pass/Fail status, and remarks. Share with contractor for rectification.