Pre-Renovation Prep Checklist
Settle everything before hammers come out. 10 categories, 65+ checkpoints — society, neighbours, utilities, contract, protection, debris, stay / move-out, safety, schedule, insurance.
0
Pass
0
Fail
0
N/A
55
Pending
0%
Ready
Project Details
Society / Association Approvals
Written NOC from society
Application submitted with scope of work
Managing committee approval letter
Date range of work stated
Security deposit paid (if required)
Structural work clearance
No demolition of RCC walls without structural engineer sign-off
Architect's plan approved by society engineer if required
No additions to facade without permission
Work-hour restrictions
Permitted hours confirmed (usually 9 AM – 6 PM)
Silence zones around exam / festival periods
No Sunday / holiday work (in most societies)
Workers access
Worker ID / police verification if required
Service lift usage rules
Visitor pass / gate entry process
Debris management clause
Daily debris removal rule
No accumulation in common areas
Dumping location and fees
Deposits and charges
Security deposit to cover damage
Lift / common area damage clause
Fines for rule violation
Neighbour Intimation
Direct neighbours informed
Flats adjacent (left / right / above / below)
Written / WhatsApp intimation with dates
Contact number shared for concerns
Detailed scope shared
Nature of work (plumbing / structural / painting)
Noise-intensive phases identified
Wet work days flagged
Pets and elderly
Adjacent flats with pets / elderly informed separately
Options to reduce impact discussed
Wall-shared work
Drilling on common walls intimated
Window timings agreed (morning preferred)
Dispute escalation path
Society committee copy on intimation
Logs kept of any complaint received
Utilities & Temporary Setup
Water connection for workers
Source identified (tap / temporary line)
Water bill reading recorded before work
Metered vs unmetered charges clarified
Electrical connection
Worker power from dedicated circuit
ELCB on site
No tapping from neighbour
Meter reading recorded before work
Temporary toilet / wash
Identified location for workers
Agreement with society
Hygiene maintained
Waste segregation
Bins for dry / wet / construction debris
No mixing with society bins
Vendor booked for C&D removal
Gas / internet isolation
Gas meter location protected
Wi-Fi router moved to safe zone
ISP informed if service expected to be interrupted
Contract & Scope Lock
Detailed BOQ signed
Every line item priced
Brands and specifications locked
No 'as agreed verbally' items
Payment milestones
Tied to completion percentage
No large advance (< 20%)
Retention 5-10% until final snag clearance
Timeline and penalties
Start and end dates signed
Daily / weekly penalty for delay
Force majeure clause
Scope freeze
Variation order process written
Price changes only with signed variation
No verbal extras
Warranty
Workmanship warranty minimum 1 year
Waterproofing 5 years
Material warranties pass-through from brand
Payment method
Bank transfer with invoice
GST invoice for input tax credit
No large cash payments
Termination clause
Exit terms if contractor defaults
Material and tool ownership clause
Partial payment settlement formula
Home Protection & Preparation
Floor protection
Corrugated boards / tarpaulin on existing flooring
Extra protection at door thresholds
No direct trolley movement on tiles
Furniture storage
Items moved to one locked room
Covered with plastic sheet
Inventory list made
Valuables off-site
Kitchen and bath isolation
Unrelated fixtures covered
Taps protected
Appliances disconnected and stored
Electronics and soft furnishings
TV, PC, speakers packed and stored off-site if possible
Curtains / rugs removed
Books / art stored
Plants and pets
Plants moved to balcony or neighbour
Pets relocated or kept in one sealed room
Boarding booked for noise-intensive phases
Walls and doors
Non-work doors taped and kept shut
Switchboards covered
Door hinges greased before work to ease shut-close
Debris & Material Management
Debris removal vendor
C&D waste vendor engaged (licensed)
Pickup schedule set
Cost per trip / tonne agreed
On-site staging area
Designated area within flat or society
No blocking of common pathways
Protected from rain (tarpaulin)
Material delivery schedule
Heavy / bulk material in off-peak hours
Coordinated with society security
No flat / lift blocking
Dust control
Plastic sheeting at doorway
Wet sweeping (not dry)
Air quality managed for asthma / senior neighbours
Hazardous material handling
Asbestos identified (old buildings) — special disposal
Lead paint check in pre-2000 homes
Chemical containers stored safely
Move-Out / Stay-Through Planning
Decision — move out or stay
Full move out for full home renovation
Partial / room-by-room if staying
Short-term rental / hotel budgeted
Temporary residence logistics
Location and duration set
Essential items packed (medicines, documents, clothes)
Address update for deliveries
Essentials kept accessible
Medicines, passport, work documents
Chargers, laptops
Change of clothes
Meal plan during work
Kitchen access planning
Tiffin service / eating out budget
Gas cylinder refill before start
Kids and school routine
School pickup / drop adjusted
Study space maintained
Noise impact on study hours planned
Safety During Work
Worker safety gear
Helmets at demolition stage
Goggles / masks for cutting / grinding
Gloves for handling sharp materials
Contractor responsibility in writing
First-aid on site
Kit accessible on site
Nearest hospital identified
Accident insurance for workers (contractor responsibility)
Fire safety
Extinguisher on site during hot work (welding / torch)
No smoking zones
Flammable materials stored separately
Electrical safety during work
Licensed electrician for any alterations
No exposed wiring
ELCB at power take-off
Temporary lighting IP rated
Children and pet safety
Locked doors to work area
No access during active work
Communication with workers on timing
Neighbour safety
Scaffolding safe for passers-by below
Falling-object protection
Warning signage
Schedule & Communication
Weekly schedule shared
By contractor — what happens this week
Milestones marked
Any slippage flagged on Monday
Site visit schedule
You or your representative visits fixed days
Record of each visit
Sign-off after each milestone
Daily site log
Workers on site
Material received
Work completed
Issues raised
Design decision dates
Calendar of 'decide by' dates for materials, colours, hardware
No decisions held as blockers
WhatsApp / project group
Group with you, contractor, designer
Photo updates daily
Written record of instructions
Insurance & Documentation
Home insurance update
Insurer informed of renovation
Cover during work period confirmed
Renovation exclusions reviewed
Contractor insurance
Workmen compensation valid
Third-party liability cover
Copy of policy on record
Before-work photos
Every room photographed
Existing damage / condition dated
Shared to all stakeholders
Legal documents safe
Title, sale deed, society papers off-site
Digital scans cloud-backed
GST and vendor compliance
Vendor GSTIN verified
Input tax credit eligibility clarified
Bills / invoices filed weekly
Download Pre-Renovation PDF
Complete every item before day one. Most renovation disputes start here, before any physical work begins.
Related Tools — You may also find these useful
Interior Contract Clause Checklist
16 sections and 98 checkboxes covering scope, BOQ, milestones, penalties, warranty, and disputes.
Contract ChecklistInterior Contract Template — India
Legally-refined contract template with payment milestones, timeline, warranty, and jurisdiction fields.
Contract GeneratorInterior Red Flag Checklist — Before Signing
54 red flags across 8 categories with a live risk score and personalised PDF.
Red Flag Checklist